1248 Glen Haven Lane Batavia, OH 45103
(513) 753-1205
Fax: (513) 753-1173

Phillip Morris USA

    Home / Phillip Morris USA

SOFTWARE YOUR BUSINESS CAN’T AFFORD TO BE WITHOUT
SIM TECHNOLOGIES CORPORATION – Case Studies
DISCOVERING THE POSSIBILITIES

Philip Morris
Company: Philip Morris, U.S.A. – Large Consumer Products Company
Product Used: Capacity Planning and Scheduling System
Objectives:Develop computer tool to:

  • Schedule the production operations on a daily basis
  • Use for long term capacity planning

Results:

  • Prototype scheduling system delivered in 4 months
  • Linked to external data bases
  • Successfully duplicated weekly schedule in 15 seconds
  • Improved current schedule by optimizing total changeover time
  • No limit on scheduling time horizon