Lean Manufacturing Planning System
Phase I
· Annual labor savings of $1,000,000
· Annual facility savings of $60,000
· Floor space savings of 10,000 sq.ft.
Phase II
· Potential annual labor savings of $940,000
· Potential floor space savings of 10,000 sq. ft.


SIM Technologies Corporation awarded contract for Flexible Manufacturing Simulation System (FMSS) software
September 1, 2006

 

SOFTWARE YOUR BUSINESS CAN'T AFFORD TO BE WITHOUT
SIM TECHNOLOGIES CORPORATION - Case Studies
D I S C O V E R I N G  T H E  P O S S I B I L I T I E S


Company:
PHB, Inc. - Contract Manufacturer
Product Used:
Flexible Manufacturing Simulation System
Objectives:
Determine optimum system configuration which would result in the most cost effective solution to meet the production requirements.
Results:
6 Palletech System configurations were evaluated based on the following:

 » Total Process Time
 » Machine Center Utilization
 » Operator Utilization
 » Rail-Guided-Vehicle Utilization

 A detailed report was published on the results, findings, and recommendations provided with a high degree of confidence on the expected results. The analysis eliminated in excess of $750,000 in capital investment.

 

    

 