6 Palletech System configurations were evaluated based on the following:
» Total Process Time
» Machine Center Utilization
» Operator Utilization
» Rail-Guided-Vehicle Utilization
A detailed report was published on the results, findings, and recommendations provided with a high degree of confidence on the expected results. The analysis eliminated in excess of $750,000 in capital investment. |