|
|
The primary purpose of MPS is to determine if sufficient capacity is available (in terms of equipment) to satisfy the stated demand. The user can vary the following operating parameters to conduct a “what-if” analysis:
The user can run MPS with the specified parameters and view the results. All time based output units in this system are in minutes. The software will generate an output report for each of the following:
Graphical charts can be generated for the station utilization and station queue sizes. MPS can be used as often as needed, based on the business/operating environment. The software allows the analyst to evaluate future business and operating scenarios to optimize the utilization and throughput of the process area.
©2006 SIM Technologies Corporation. All rights reserved.
|