Case Study – Sunstrand Corporation
Eliminated $500,000 in equipment cost
Alternative production schedules tested to determine maximum throughput capability
System control logic was changed to eliminate unnecessary downtime
2006 SIM Technologies Corporation. All rights reserved.
FAQ
Contact Us
News & Events
Download Reports
Company Profile
Case Studies
Software
Home
Virtual Factory