Company: |
Visteon/Ford Electronics Manufacturing Corporation - Automotive Component Manufacturer |
Product Used: |
Capacity Planning and Scheduling System |
Objectives: |
Determine the following for the Instrument Cluster Assembly, Test, and Packaging operations:
» Identify a more cost effective assembly and test method for the Instrument Cluster product families (in terms of equipment and personnel)
» System throughput capability
» Develop a system to include the Flexibility/Adaptability to accommodate changes in the production requirements
» Improve floor space utilization |
Results: |
Phase I
» Annual labor savings of $1,000,000
» Annual facility savings of $60,000
» Floor space savings of 10,000 sq.ft.
Phase II
» Potential annual labor savings of $940,000
» Potential floor space savings of 10,000 sq. ft. |
|