Capacity Planning & Scheduling System

The primary purpose of the Capacity Planning & Scheduling System (CPSS) is to determine if sufficient capacity is available (in terms of equipment) to satisfy the stated demand.  The user can vary the following operating parameters to conduct "What-If" analysis:

 

bullet

The time period to simulate up to 365 days

bullet

The number of shifts per day, and hours per shift

bullet

The job numbers to be produced – CPSS has the capability to handle up to four hundred (400) different job numbers 

bullet

The consolidation period, unit sales price, engine, stage, customer, and cluster size

bullet

The production forecast for each quarter

bullet

The production shipments for each quarter

bullet

The production requirements for each quarter

bullet

The in-process inventory

bullet

The type of station used to process the parts (these stations can be either manual or automatic) - CPSS has the capability to handle up to eighty (80) different station types

bullet

The station capacity

bullet

The operating sequence for each part type – this defines the sequence of operations (by station) for each part type up to sixty (60) processes

bullet

The pass rate by job number and process

bullet

The cycle time by job number and process

bullet

The setup time by job number and process

bullet

The rework station for each job number

bullet

The Mean Time Between Failure (MTBF) and Mean Time To Repair (MTTR) for each station - this is referred to as "Failure, Repair Times" in the user interface screen.  CPSS uses an exponential distribution when assigning a value for MTBF and a normal distribution when assigning MTTR.

bullet

The furnace approvals by job number

 

CPSS will simulate production according to the specified operating parameters.  CPSS will then create a production schedule based on the results of the simulation.  The production schedule is based on the due date and the operating parameters defined by the user (i.e., production quantity, product routing, setup/cycle times, downtime, etc.).  All output units in this system are in minutes.  The results are divided into four categories:

bullet

Average part process time

bullet

Station utilization, which would include the percent of time the resource was busy, idle, inactive, or down

bullet

Station queue sizes

bullet

Simulated production

 

CPSS can be used as often as is needed, based on the business/operating environment.  This will allow the analyst to evaluate future business and operating scenarios to optimize the utilization and throughput of the Process Area. 